Exclusive | Marina View | Branded Residences
Dubai Harbour · Address The Bay · 1
Risk score
Gates
Listing facts
- Price (AED)
- 3,300,000
- Size (sqft)
- 844
- PPSF
- 3,909
- Type
- Apartment
- Bedrooms
- 1
- Bathrooms
- 1
- Completion
- off_plan
- Furnished
- NO
- Agent
- Peter Burns
- Listed
- 2026-02-27
- Computed
- 2026-05-11 16:21:36
Photos (3)
×6 dup1
×2 dup2
×2 dup3--call1 to populate.Flags (3)
- High−0.20photo pHash duplicate cross listingphoto_pHash_duplicate_cross_listing3 of this listing's photos appear on 1 other listing (Hamming ≤ 32, PDQ-256)
evidence
{ "totalMatches": 3, "matchedListings": [ "57768279" ], "photosWithMatches": 3 } - Low−0.05Not PF-verifiedverification_missingListing not marked verified by PropertyFinder
evidence
{ "is_verified": false } - Medium−0.15photo count low actualphoto_count_low_actualOnly 3 photos downloaded (claimed counts in raw can lie — this is from the actual fetch)
evidence
{ "actual": 3, "totalRows": 3, "downloadOkCount": 3 }
Description
Set within the now well-established and highly sought-after waterfront community of Emaar Beachfront, Address The Bay offers an opportunity to secure a home or investment of a higher calibre, positioned perfectly within an evolving coastal community. Located on a mid-floor, this residence enjoys a marina-facing aspect at eye level, a constant presence from within the living space. This position avoids the common compromise of waterfront properties where views are limited to open sky without stepping onto a balcony. Here, the apartment benefits from a balance between outlook, natural light and privacy. As of February 2026, the project is approximately 60% complete, while the wider Emaar Beachfront community is already well established, with completed beaches, an active boulevard, and a growing selection of licensed food and beverage venues creating a welcoming and increasingly vibrant environment. Residents benefit from direct private beach access alongside branded amenities, landscaped areas, swimming pools, and a fully equipped gym, all within close proximity to Dubai Marina. Buying at this stage allows entry into a thriving community rather than a construction site, while still benefiting from future upside as the final residences are delivered. Estimated handover is Q1 2027. Payment plan: 60% Paid to date10% on 25th March 202610% at 80% construction completion20% upon handover Exclusive with Habitare. Agents welcome.